๐๏ธ2026-10-15 Addendum
Skeleton only. The Japanese page records 10/15 and the snapshot after 10/16 00:00 JST.
This English page is a skeleton. The full record is in the Japanese page (โ2026-10-15 ใฎ่ฟฝใๆธใโ).
- Merged on 2026-10-15 (JST), counted with
ghat 21:18: platform 23, bridge 21, voice-edge 9, docs 0 โ 53 PRs (matches the instructionโs 53). - Speed baseline (br=08479d1, n=10, real keys 10): p50 = 1056 ms, p95 = 3838 ms (p95 is the single maximum at n=10).
Snapshot after 2026-10-16 00:00 JST
- Counted with
ghat 01:12 JST: bridge 1, platform 0, voice-edge 0, docs 0 โ 1 merged PR. - The one merge is bridge #408 (
66ed925): the box now uses its ownaegis-pi-boxalias, does not read the production address, and verifies the destination before proceeding. - Main refs at the snapshot: br=
66ed925, pf=66a96f8, ve=58dcd33, docs=19957bc. - D7 PRs #410โ#415 are still open and stacked. Their top head is
0834be1; none of that D7 implementation is in main, so it is not described as completed. - PR #46 itself remains a draft and unmerged. This addendum is not part of the published source of truth until it is merged.
Second snapshot at 04:47 JST
- Recounted with
gh: bridge 1, platform 0, voice-edge 0, docs 0 โ still 1 merged PR since 2026-10-16 00:00 JST. - Main refs are unchanged: br=
66ed925, pf=66a96f8, ve=58dcd33, docs=19957bc; D1โD6 therefore have no implementation change since the 01:19 snapshot. - PR submitted (awaiting merge): A is bridge #417/#420 plus voice-edge #529; D7 is bridge #410/#411/#412/#413/#418/#414/#415 with top head
4f5f2e8; C is bridge #409/#416/#422; E is platform #446โ#453 plus voice-edge #530; F is platform #454/#445/#444 plus bridge #421/#419. - None of those PRs is merged. E still lacks the Pi-side E6 implementation and a real transcription connection. D7 still lacks sufficient customer-ear samples, the real neutral recording, and some complete metrics, so neither is described as completed.
- PR #46 remains a draft and unmerged after this update.
Third snapshot at 21:54 JST on October 17
- Main refs: bridge=
3f4256d, platform=2a68623, voice-edge=326a48d, docs=19957bc. - Merged: C/H scenario tests, A life-word handling, B/D7, F OpenAI cost accounting, NOTIFY, and two false-positive fixes. This does not mean production rollout.
- PRs pending: E, WARM, I, K, J, โremember me,โ and the next false-positive fix.
- D7 remains default OFF and incomplete until the caller-speech overlap, latency target, real recording, required sample size, and metric gaps are closed.
- No Pi, NAS, HGW, production flag, real key, or real call was inspected. PR #46 remains a draft.
Fourth snapshot at 04:38 JST on October 18 (refreshed by t4)
- The third snapshot above is kept as the 21:54 record. Since then E, WARM, bridge #443, K, and I were merged (re-read with
ghat 04:37โ04:38). - Main refs: bridge=
43123fa, platform=233a28e, voice-edge=975f3f5, docs=19957bc. - Newly merged: E, WARM, I (outbound test calls stay at 0), K, and false-positive fix #443. Their flags are default OFF in main; this does not mean production rollout.
- PRs pending (awaiting the go-ahead): โremember me,โ J, and the bridge CI speed-up #441.
- No Pi, NAS, HGW, production flag, real key, or real call was inspected. PR #46 remains a draft.